Extension of Szaa Satu Mare to Ardud, Baba Novac, Gelu, Dobra and Bogdand. Extension


Home > Extension of Szaa Satu Mare to Ardud, Baba Novac, Gelu, Dobra and Bogdand. Extension


Country : Romania
Summary : Extension of Szaa Satu Mare to Ardud, Baba Novac, Gelu, Dobra and Bogdand. Extension of the Sewerage System in the Ardud Cluster. Identification Number: Poim-sm-cl-02.1
ROT Ref No : 47748495
Tender Notice No : 559896-2020
Competition : ICB
Financier : Self Financed
Purchaser : APASERV SATU MARE S.A.
Address: Str. Ferăstrău train station no. 9 / A
Town: Satu Mare
NUTS-Code: RO115 - Satu Mare
Postal Code: 440210
Contact Point: Monica-Tatiana Sălăjan
Phone: +40 261759080
Fax: +40 261721056
Romania
Email :salajan_monica@apaservsm.ro
URL :www.apaservsm.ro
Tender Details : Document Type: Corrigendum / Additional information (Please refer tender document)
Title: Extension of SZAA Satu Mare to Ardud, Baba Novac, Gelu, Dobra and Bogdand. Extension of the sewerage system in the Ardud cluster. Identification number: POIM-SM-CL-02.1
Reference Number: 16844952_2020_ PAAPD1111751
Contract Type: Works
Description: Construction works include:
- Object no. 2.1.1 "Sătmărel-Ser Adduction (Satu Mare ATU, Doba ATU, Terebești ATU, Ardud ATU, Beltiug ATU, Supur ATU and Bogdand ATU)";
- Object no. 2.1.2 „Water supply networks in Ardud ATU - Baba Novac locality. Extension of the existing GA and the new Ardud GA. Extension of the existing Baba Novac GA and sewerage networks in Ardud ATU-Ardud locality ”;
- Object no. 2.1.3 „Extension of the existing GA in Terebesti ATU - Gelu locality”;
- Object no. 2.1.4 „Dobra water household extension - Supur ATU”;
- Object no. 2.1.5 „Extension of the Bogdand ATU Water Household”.
The duration of the contract of 67 months, provided in section II.2.7), includes the duration of execution of the works = 31 months and the guarantee period = 36 months.
In accordance with the provisions ...
Deadline : 27th Nov 2020
Documents : Download